HayesRemovals
Service

Flats & maisonettes in Hayes

Flats and maisonettes across UB3 and UB4 — ex-council maisonettes, canal-side and factory-quarter conversions, and newer blocks by the station.

Hayes flats come in three kinds and they behave nothing like each other. Worth separating, because a quote that treats them the same will be wrong on at least two.

Maisonettes

Common across Yeading and Botwell, and a distinct kind of job rather than a flat with extra steps. Most have an external stair up to a first-floor front door, frequently with a shared landing below — so everything is carried outside before it is carried inside. That changes what needs covering, where the vehicle stands, and what happens if it rains.

What we ask before pricing:

  • Internal stair or external
  • How tight the turn is, and whether there is a half-landing
  • Whether the entrance or landing is shared
  • Where the vehicle can stand relative to the foot of the stair

The factory-quarter conversions

The old industrial buildings around the canal and the Blyth Road area make handsome flats: high ceilings, generous rooms, large windows. The catch is that a converted factory usually has one goods lift serving everybody, so the move is booked into a slot rather than started whenever the crew arrives. We arrange that with the building manager.

Newer blocks

Around the station and the redeveloped sites. Loading bays, service lifts, a managing agent who wants the move booked in advance. Physically the easiest addresses on the patch, administratively the ones that want the most notice.

Related

Houses are on house removals; a single room is usually man and van.

Before you book

Flat move questions

What is a maisonette move like?

Its own job. Most have an external stair to a first-floor front door, often with a shared landing below — everything is carried outside before it is carried inside, which changes the day in wet weather.

Are the factory conversions different?

Yes. Generous rooms and large windows, with one goods lift shared by the whole building. That wants booking rather than queuing for.

Do the newer blocks have rules?

Usually — a loading bay to book, a lift to reserve, occasionally proof of insurance first. Start a fortnight out.

What do you need to know?

Which floor, whether the stair is internal or external, how tight the turn is, and where a vehicle can stand relative to the door.

Is communal protection included?

Yes. Your neighbours did not agree to your move; edges get protection and the route stays passable.

Next step

Moving out of a flat or maisonette?

Tell us the floor, whether the stair is internal or external, and whether the building has a goods lift to book.